Project Info
- Category: Infrastructure
Project Details
This toll-based project was awarded to Atlanta – SREI consortium in September 2006. The scope of the work includes improvement, operation and maintenance including strengthening and widening of the existing Two-lane road to Four-lane, dual carriageway on the NH-6 (Nagpur-Kondhali section) – a stretch just outside Nagpur city in Maharashtra. A sizeable amount of inter-state […]
Project Details
This toll-based project was awarded to Atlanta – SREI consortium in September 2006. The scope of the work includes improvement, operation and maintenance including strengthening and widening of the existing Two-lane road to Four-lane, dual carriageway on the NH-6 (Nagpur-Kondhali section) – a stretch just outside Nagpur city in Maharashtra. A sizeable amount of inter-state and intra-state traffic passes through this route and there is no convenient alternative route to this stretch.
The company has formed a Special Purpose Vehicle (Balaji Toll ways Ltd.) for this purpose. Atlanta holds 99.94 per share holding in the SPV.
Project Details :
- Cost of the project Rs. 3160 Lakhs.
- Length of road 40.8 kms
- Concession period 26 years
- Completion of construction COMPLETED ON SEPTEMBER 2011.
- Four Laning of 40.8 kms of Nagpur-Kondhali section of NH – 6.
- Part of NH – 6 which connects Kolkatta and Mumbai/Surat through West Bengal, Jharkhand, Orissa, Chattisgarh & Maharashtra.
- NH – 6 intersects NH – 3 at Dhule which connects Mumbai and Agra through Nasik, Indore, Dhule and Gwalior.
Atlanta’s Role :
Design, construction, project management, operations, maintenance and toll collection