Nagpur Kondhali Toll Plaza

Project Info
  • Category: Infrastructure
Project Details

This toll-based project was awarded to Atlanta – SREI consortium in September 2006. The scope of the work includes improvement, operation and maintenance including  strengthening and widening of the existing Two-lane road to Four-lane, dual carriageway on the NH-6 (Nagpur-Kondhali section) – a stretch just outside Nagpur city in Maharashtra. A sizeable amount of inter-state […]

Project Details

This toll-based project was awarded to Atlanta – SREI consortium in September 2006. The scope of the work includes improvement, operation and maintenance including  strengthening and widening of the existing Two-lane road to Four-lane, dual carriageway on the NH-6 (Nagpur-Kondhali section) – a stretch just outside Nagpur city in Maharashtra. A sizeable amount of inter-state and intra-state traffic passes through this route and there is no convenient alternative route to this stretch.

The company has formed a Special Purpose Vehicle (Balaji Toll ways Ltd.) for this purpose. Atlanta holds 99.94 per share holding  in   the SPV.

Project Details :

  • Cost of the project                      Rs. 3160 Lakhs.
  • Length of road                            40.8 kms
  • Concession period                   26 years
  • Completion of construction      COMPLETED ON SEPTEMBER 2011.
  • Four  Laning of 40.8 kms of Nagpur-Kondhali section of NH – 6.
  • Part of NH – 6 which connects Kolkatta and Mumbai/Surat through West Bengal, Jharkhand, Orissa, Chattisgarh & Maharashtra.
  • NH – 6 intersects NH – 3 at Dhule which connects Mumbai and Agra through Nasik, Indore, Dhule and Gwalior.

Atlanta’s Role :

Design, construction, project management, operations, maintenance and toll collection